Bathroom
Selected Build Area. Retained records remain available under project visibility.
Bathroom work selected for this Project.
Current System Snapshot
System Summary
System Specifications
Components in This Build Area
Build Area Journal
Installed and test-fitted the plumbing components underneath the shower area. The layout was designed to maximize the limited space available while maintaining access for future maintenance. The shower drain routes directly to the shower sump system, which will automatically discharge gray water to the holding tank. Care was taken to keep plumbing runs as short and direct as possible to improve drainage and simplify future service.
This photo documents the plumbing configuration before the floor and surrounding structures are fully enclosed.
Needed a specific sink due to the small space in it needed to fit in 17” max.